Today i have reinstalled windows and software on my parents laptop, also i upgraded hard disk and ram on it and cleaned the motherboard from dust and changed the thermo paste on the CPU.
понедельник, 3 ноября 2014 г.
Dag 4
Today i was assembling and placing new lights in the store, i also had to manually place the wire and make it just the right size, i used electric drill, screwdrivers, and other tools to work with electricity and wires.
среда, 29 октября 2014 г.
Dag3
Today, i have been all day wprking with installing windows, software and driver on laptops. And installing new ssd's in them.
вторник, 28 октября 2014 г.
Dag2
Today i have finished projector room. I made a hole in the table to make wires go trough and made all cables go trough tunnels i made. After that i switched few light bulbs in the store. and after that i recited task to install windows and software on 5 Dell laptops.
Dag1
The first day I dissemble the roof lights that didn't work anymore I also helped testing motherboards USB, and received a project to make cable tunnels and put cables from the projector through them. I am half way done with this project.